- The use of any stimulation method which is used to enhance the
productivity / injectivity of a well
- The stimulation methods are executed after initial drilling into the
reservoir
- The stimulation methods used in an individual case depends on:
- Geological setting (porous of fracture controlled reservoir, stressfield, …)
- Reservoir parameters (rock type, fluid composition, …)
- Initial permeability (low or medium)
- Cost of stimulation (in budget?)
- Any use of a stimulation method defines a project as EGS?
- Only when a very low permeability is enhanced considerably?
Dr. Horst Kreuter
|